Project Brief:
- Materials recovery facilities (MRF) plant for the daily processing of 2,000 metric tonnes of municipal solid waste (MSW)
- Engineered vertical landfill cells (6 numbers) for a daily landfilling capacity of 1,400 metric tonnes
- Basal treatment using lime stabilization technique
- Designed with a leachate collection system
- Designed with gas collection structures for future gas flaring or capturing
- Raw leachate pond for equalization of leachate from various streams
- Completed first engineered landfill cell and raw leachate pond in October 2019