Project Brief:
- Lime stabilization for construction of stabilized subgrade of 300-350mm thick at the base and side slopes of the engineered landfill cell (first cell)
- Subgrade materials are of marine clay nature which is soft, soggy, and with low permeability
- Completed the first cell in June 2019